Foundation inspection got done and now the crawling space is getting covered with insulation.
Sunday, August 30, 2009
Wednesday, August 26, 2009
Touching wood.
This is it, I guess most of the concrete the house will ever see has been poured - excluding stucco I guess. Now it is moving quite visibly fast, with the joists being put in place and along with the plumbing, sewer, heating lines that are lying under the sub floor.
Now some of the framing material has arrived already as you can see here:
Now some of the framing material has arrived already as you can see here:
Monday, August 17, 2009
Out of the coffins
Most of the foundation is now out of the coffins and the overall shape of the house - at least on the floor - is starting to come clean. The removal of the home office and reduction of 3 feet off the back seems to make a good difference as we were hoping for. The front of the house even though it will be bigger than before does not appear to jump too much in the face when looked from the road side (right side on the street).
Tuesday, August 11, 2009
Solidworks
Sunday, August 2, 2009
Clean-up
Subscribe to:
Posts (Atom)